Pro Timber Floor Soundproofing System – Bonded LVT

Best Suited For 

  • Timber floors with a bonded LVT finish
  • Rooms where you want a higher level of reduction for: Loud noise and music Bass-heavy sound Footfall / impact noise
  • Projects where you’re willing to lift floorboards and rebuild the deck for better performance

Use the Soundproofing System Calculator below to enter your area and get the correct quantities — then simply add everything to your cart.

Fast Shipping

Stress Free

100% Eco-friendly

packaging

30 Day Money Back
Guarantee

Maximum Timber Floor Upgrade for Loud Noise and Music (Bonded LVT Finish)

Our Pro Timber Floor Soundproofing System – Bonded LVT is our highest performance timber floor build-up for situations where you’re dealing with loud noise, music, or persistent impact noise and need a more serious upgrade. This system improves performance by upgrading the structural deck using 22mm STS TG4 and adding decoupling and damping at the joists with Green Glue Joist Tape, before finishing with mass loaded vinyl and a bonded LVT-ready acoustic layer using SilentCork3 and Mapei VS90.

To make things easier, our online calculator works out the quantities required for your project, with an additional 5% already allowed for waste.

Designed for Loud Noise & Music Through Timber Floors (Bonded LVT Finish) 

Our Pro Timber Floor Soundproofing System – Bonded LVT is designed for timber floors where you need a higher level of sound reduction than mat and underlay systems can typically provide — particularly for loud airborne noise (music, bass, TV at higher volume) and impact noise. This is an advanced DIY system because it involves lifting the existing floorboards and installing a new structural deck.

The build-up consists of:

  • Remove existing floorboards
  • Green Glue Joist Tape applied to joists
  • 22mm STS TG4 (structural deck)
  • 50mm Cement Board Screws (for fixing the deck)
  • 2 layers of 5kg MLV (Soundproofing Mat)
  • SilentCork3 
  • Mapei VS90
  • AC95 Acoustic Sealant
  • Jointing Tape
  • Contact Adhesive

The finished build-up is approximately 35mm overall.

Important Supply Information 

All components required for this system are supplied by us as part of the calculator output.

How the System Works

This system improves floor sound insulation using multiple mechanisms:

  • Joist tape helps reduce vibration transfer at the joists which is a common weak point in timber floors
  • 22mm STS TG4 Floorboard adds stiffness and mass, improving the base structure before adding acoustic layers
  • MLV layers add dense mass to reduce airborne sound transmission
  • SilentCork3 improves impact reduction and provides a suitable layer for bonded LVT systems
  • Mapei VS90 is used to bond the system correctly for this floor finish
  • Acoustic Sealant  and Jointing Tape reduce sound leakage through gaps and joints the ensure airtightness

What We Supply 

The system calculator works out the estimated quantities required for the soundproofing materials we supply, including:

We also include an additional 5% allowance for waste in the calculated quantities.

Your Soundproofing System Calculator



Key Benefits 

  • Highest performance timber floor option for loud noise and music Improves both airborne and impact noise performance
  • Structural upgrade with 22mm STS TG4 Floorboards 
  • Reduced vibration transfer using Green Glue Joist Tape
  • Suitable for bonded LVT installations (includes Mapei VS90)
  • Calculator provides a quick material estimate
  • Includes a 5% waste allowance in the calculated quantities


Important Notes

  • This is an advanced DIY system and involves removing existing floorboards
  • Results will vary depending on joist spacing, void depth, existing ceiling below, and flanking paths
  • Sealant quantities are an approximation only and should be treated as a guide
  • The calculator is provided as a guide only, and final quantities should always be checked before ordering
  • Always follow the adhesive and flooring manufacturer’s guidance for installation and curing times
  • If the floor below is a sensitive area, consider addressing the ceiling below as well for best results


Installation Summary 

  1. Lift and remove existing floorboards
  2. Apply Green Glue Joist Tape to joists
  3. Install 22mm STS TG4 using 50mm cement board screws and PU adhesive
  4. Install first layer of 5kg MLV
  5. Install second layer of 5kg MLV, staggering joints where possible
  6. Tape joints and seal perimeter gaps with AC95
  7. Install SilentCork3
  8. Use Mapei VS90 as required for a correct bonded LVT installation

For a more detailed installation guide click here.


Calculator Disclaimer 

This calculator is intended as a guide only. Advanced Acoustics will not be held responsible for any decisions made as a result of using this calculator.